Mechatronics Engineer
Amirhossein
Nematkhah
Mechanical Design • Industrial Systems • Project Control
AI & Automation • Simulation & Control

12+
Projects Completed
3+
Years of Experience
15+
Technologies
About
Engineering meets intelligent design.
Mechatronics engineer with industrial experience in mechanical design, production systems, project management, industrial equipment development, and intelligent automation. Experienced in CAD design, simulation, industrial engineering workflows, and modern AI-based robotics research.
B.Sc. Mechanical Engineering
Sahand University of Technology
M.Sc. Mechatronics Engineering
Amirkabir University of Technology — Ongoing
Portfolio
Featured Projects

3D Modeling
Legbelt — Smart Bed Bug Trap System
Designed a furniture-integrated bed bug trap system focused on discreet protection, modern aesthetics, and user-friendly integration. Developed the mechanical structure, industrial design, and product visualization with attention to manufacturability and structural stability.
- 3D Modeling in SolidWorks
- FEA Analysis for Structural Validation
- Motion Study & Optimization
- Detailed Manufacturing Drawings
Skills
Technical Expertise
Experience
Industrial Timeline
Industrial Designer
Mechatronic Mobtakeran Arg
- • Laboratory printers
- • Dental milling systems
- • Dental scanners
- • Mechanical product development
Mechanical Designer & Engineer
Iranian Steel Development Group
- • Steel production line equipment
- • Industrial machinery design
- • Manufacturing supervision
- • Project scheduling and control
Product Designer
NYOP — Netherlands
- • Smart home products
- • Smart insect trap
- • Air quality monitoring
- • Prototype development & CAD optimization
Research
Research & AI
Reinforcement Learning
Reward shaping & policy optimization
Autonomous Systems
Mobile robotics & navigation
LLM-Based Reward Shaping
Language models guiding RL agents
Sensor Fusion
Multi-modal perception & estimation
Intelligent Control
MPC, adaptive & robust control
Robotics Safety
Constrained learning systems
Credentials
Certificates
Professional courses and credentials earned across engineering, simulation, and intelligent systems.
Contact